VALYARD

Powered land for AI factories · Poland

Megawatts first. Then the factory.

Valyard finds land in Poland that already has a grid connection, secures it, and hands AI cloud operators an energized site ready for containerized AI factories.

Fig. 1 · Typical first clusterSingle-line, not to scale
First cluster30MW
Per site5–15MW
Signed site to power6–18mo
Long-term pipeline500MW

Targets, not commitments.

Why brownfield

Power is the bottleneck. Old industry already has it.

A new connection to the Polish grid takes years. Former industrial parks, small distribution networks and heating plants already hold substations and contracted capacity. We put that capacity back to work.

110 kV on site

Substations that already exist

Post-industrial parks often run their own high-voltage stations, sized for plants that no longer need them.

Contracted capacity

No queue for new conditions

Small distribution networks can host a load inside capacity they have already contracted with the grid.

Heat demand next door

A buyer for the waste heat

EU rules ask data centers above 1 MW to reuse their waste heat or show why they can't. District heating next door solves that.

How it works

From a map to a live pad.

Our first survey covers Warsaw, Poznań, Katowice and Kraków: 1,199 land clusters of 1 ha or more, and 213 campus-size sites of 12 ha or more.

  1. Map

    Every substation, zoning plan and parcel around the metros, scored for power and speed.

  2. Secure

    We buy, lease or form a joint venture with the owner of the site and its connection.

  3. Energize

    Transformers, medium voltage and backup sized to the load, with the network operator on board.

  4. Deploy

    Operators bring containerized AI factories. Each pod lands on a pad that is already live.

Where we look

Four kinds of site move fastest.

Site typeTypical blockWhy it is fast
Post-industrial parks with their own 110 kV stationcase by caseSubstation, land and industrial zoning are already in place.
Small distribution networks5–15 MWThe load fits inside capacity the network already holds.
District heating and CHP plants5–15 MWePower on site and a customer for the heat.
Mining and pumping infrastructurecase by caseHeavy connections built for loads that are winding down.

Dla właścicieli terenów

Masz teren z przyłączem albo wolną moc umowną?

Kupujemy, dzierżawimy albo wchodzimy we wspólne przedsięwzięcie. Szukamy:

  • bloków od 5 MW,
  • stacji 110 kV na terenie zakładu,
  • zakładów, które ograniczają produkcję i zwalniają moc.
Zgłoś teren

For AI cloud operators

Bring the pods. We bring the megawatts.

Tell us the load, the timeline and how you cool. We come back with sites that fit, energization dates and terms.

Request capacity

Talk to us.

Warsaw · Poland

adam@valyard.eu